1 single-family home, 1 semi-detached house, 3 townhouses in Usingen (Taunus). Challenging hillside development, complex site preparation, fully sold to owner-occupiers.
New Construction of Single-Family Home, Semi-Detached House and Townhouses in Usingen (Taunus)
The Usingen project in the Taunus region comprised a total of 5 residential units:
1 single-family home with 110 sqm living space
1 semi-detached house
3 townhouses
The development was carried out on a hillside property requiring extensive technical site preparation.
Project Overview
5 units (1 single-family home, 1 semi-detached house, 3 townhouses)
110 sqm living space (single-family home)
Townhouses and semi-detached house: 141 sqm living space per unit
3 full floors
Energy standard: KfW 40 + QNG+
Solid construction (sand-lime brick, reinforced concrete slabs)
12 parking spaces
100% sold to owner-occupiers
Hillside Site and Ground Preparation
The property required significant leveling works to create a stable foundation layer.
Implemented measures included:
Removal of approx. 900 tons of soil (approx. 1 meter depth)
Installation of approx. 1,500 tons of recycled crushed stone
Approx. 65 truckloads to establish a stable load-bearing layer
These measures ensured long-term structural stability and adequate load distribution.
Infrastructure and Drainage
Infrastructure works were technically demanding, as the public sewer system in the adjacent street provided limited depth, requiring drainage solutions with minimal gradient.
In addition:
3 mandatory cisterns were installed for rainwater retention
All drainage planning was implemented in accordance with local regulatory requirements.
Sales Structure
Due to its rural location in Usingen (Taunus), the project was sold entirely to owner-occupiers.
The development was fully marketed and completed without remaining inventory.
Economic Overview
With an average sales price of approximately €500,000 for the townhouses and semi-detached house, the estimated project volume ranged between €2.5–3 million, depending on the pricing structure of the single-family home.
Construction was completed within approximately 12 months from building permit approval.
Short Reference (Portfolio Overview)
Project Usingen (Taunus)
1 single-family home | 1 semi-detached house | 3 townhouses
Hillside development with extensive ground improvement
1,500 tons of recycled crushed stone installed
3 cisterns implemented
12 parking spaces | 100% owner-occupiers